Such as felt paper or cold-rolled roofing, fiberglass mesh roofing materials must be sealed in the wall in the corner, it is consistent. Corner sealed to prevent infiltration of water under the roofing materials. Sealed in the corner, you will need to use the step flashing and drip edge along the edge of the roof. You can find the materials and tools you will need to complete the work at your local hardware or home improvement store.

Laid the housewrap section 1, or find it on the wall paper, which is 24 inches above the edge, or rake, roof, It is fixed to the wall staple gun.

2 along the edge of the roof drip edge. building roofing accessories use a hammer or nail gun nails.

3, the laying on the roof, in the drip edge of the felt paper. To secure the roof felt paper, nails or use nail gun. Ensure that the edge of the felt paper extends upward at least 12 inches in the corner.

4 is placed on the edge of the roof, step flashing in the corner of the wall on the roof meet. Extending 1-1/2 inches of the edge of the roof flashing. Flashes of protection with a single nail wall in the upper right corner.

Set on the roof edge, first course of herpes zoster, shingles cover the drip edge of the overlapping 1/2 inches. Connected to the roof tile nails.

6 Roofing underlayments position step flashing under one overlapping the first one flashing. Fixed to a single screw in the upper right corner of the wall. Laid the next line of herpes zoster. Repeat this step for you to lay tile closed corner.